Forrestfield-Airport Link, Perth

AU video perth 747x445

The project comprises the design, construction and maintenance for 10 years of the Forrestfield-Airport Link, which will connect the eastern suburbs of Perth with the existing suburban rail network as well as the airport. By 2021 the line is expected to generate 20,000 passenger trips on the network every day. It will also reduce road traffic and travelling times.

Salini Impregilo and its joint-venture partner NRW Pty Ltd (80% of the joint-venture is held by Salini Impregilo) will build three stations, twin-bored tunnels, three emergency egress shafts and parking spaces.

Each tunnel is 8 kilometres long (internal diameter 6.17 metres and excavation diameter 7 metres), for which two tunnel boring machines (TBMs) have been specifically designed.

Perth

An in-depth view of the Project

Diversity is our standard

This website uses third-party cookies to send the User ads and services that correspond to his/her preferences.
Should the User wish to know more or deny his/her consent to all or to some cookies, he/she must select the "click here" button. By closing this banner or continuing navigation of the website, the User accepts to receive third-party cookies.
OK